Primavera COURSE IN GUNTUR

This course provides hands-on training for Primavera’s client/server-based solution, leading participants through the entire project life cycle, from planning to execution. Topics include adding activities, assigning resources, and creating a baseline.

Primavera Training in Guntur

We at Nipuna Technologies, the best software training institute in Guntur, offer the best training and placement assistance in Primavera Course. The course is designed for students to learn basic overview, core concepts, theories, and applications; apart from the most important practical exercises.

If you are looking for a professional and high-quality institute that provides training in Guntur, Nipuna is the right and best choice. The faculty of Nipuna comprises highly skilled trainers with tons of experience who will guide you in the easy-to-learn atmosphere. You will also have access to the best practice labs dedicated to the Primavera course.

The course is designed to teach fundamentals and basics first, so that the student gets a hold onto the concepts before going deep into the subject. The study material provided will help the students to revise at home, for better understanding. Along with theory classes, students will also be trained through practice in our dedicated labs. Our faculty are always happy to guide and assist if you find difficulty in learning or understanding. The objective is to improve the skills and practical ability while doing projects.

 

Course Topics

  • Describe enterprise and project-specific data
  • Log in
  • Open an existing project
  • Navigate in the Home window and Activities window
  • Open an existing layout
  • Customize a layout
  • Save a layout
  • Describe the components that comprise the Enterprise Project Structure
  • View the EPS
  • Create a project
  • Navigate in the Projects window
  • View and modify information in Project Details
  • Define a Work Breakdown Structure
  • Create multiple levels of a WBS hierarchy
  • Describe an activity and its components
  • Describe activity types
  • Add activities
  • Add a Notebook topic to an activity
  • Add steps to an activity
  • Assign activity codes to activities
  • View a network logic diagram
  • Differentiate between the four relationship types
  • Create relationships in the Activity Network
  • Create relationships in Activity Details
  • Perform a forward and backward pass
  • Describe float and its impact on a schedule
  • Identify loops and open ends
  • Calculate a schedule
  • Analyze the scheduling log report
  • Apply an overall deadline to a project
  • Apply a constraint to an individual activity
  • Add notebook topics to constrained activities
  • Describe the available constraint types
  • Describe the difference between a work product and a reference document
  • Create a document record
  • Link the document record to a project document or work product
  • Assign the project document to an activity or WBS
  • Group activities according to a specific criteria
  • Sort activities
  • Apply a filter
  • Create a filter
  • Describe roles
  • Views the roles dictionary
  • Describe resources
  • Identify the differences between labor, non labor and material resources
  • View the resource dictionary
  • Assign roles to an activity
  • Assign rates on roles
  • Assign resources by role
  • Assign labor, nonlabor, and material resources to activities
  • Adjust Budgeted Units/Time for a resource
  • Assign expenses to activities
  • Display the Resource Usage Profile
  • Format a profile
  • Format the timescale
  • Analyze schedule dates
  • Shorten a project schedule
  • Analyze resource availability
  • Remove resource overallocation
  • Analyze project costs
  • Create a baseline plan
  • Display baseline bars on the Gantt Chart
  • Modify the bars on the Gantt Chart
  • Describe several methods for updating the project schedule
  • Use Progress Spotlight
  • Status activities
  • Reschedule the project
  • Describe reporting methods
  • Run a schedule report
  • Create a resource report with the Report wizard
  • Create a time distributed report
  • Create a report using the current layout
  • Create and launch a project Web site
  • Customize the appearance of a project Web site
  • Publish activity layouts as HTML pages

After finishing the course training, students are given 100% placements assistance, helping them secure jobs in many leading and reputed multinational companies, firms, and organizations with high salary packages. Our placement record is the best among the software training institutes in Guntur.

Call Now ButtonCall for Information